Jarlin Avalon Raised Panel WBS18-2 Waste Pull-Out Basket
Jarlin Avalon Raised Panel pairs the classic raised-center panel with a clean off-white finish: refined enough for transitional kitchens, traditional enough for classic builds.
Have a question about this cabinet? Contact us or start a Free 3D Design.
Ships by freight carrier with curbside delivery. Shipping is calculated at checkout, and Jarlin orders typically arrive within 2 to 4 weeks.
| Finish | Off White |
| Door Style | Raised center panel door, five-piece |
| Construction | 1/2" thick grade plywood box |
| Door Frame | Solid birch with veneered MDF reversed raised center panel |
| Glides | Full extension soft-closing under-mount drawer system |
| Hinges | European style fully concealed soft-closing hinges |
| Shelves | 3/4" adjustable shelves |
| Interior Finish | Clear coated natural maple |
| Overlay | Full overlay doors and drawers |
| Installation | Easy ready to assemble cabinetry |
Cabinet Details
Jarlin Avalon Raised Panel WBS18-2 waste pull-out basket. Finish-matched to the rest of the Jarlin Avalon Raised Panel line. Ships nationwide.
| Model / SKU | AL:WBS18-2 |
|---|---|
| Cabinet type | Accessory | Other |
| Brand | Jarlin |
| Full specification | Jarlin Avalon Raised Panel WBS18-2 Waste Pull-Out Basket |











